The closure of the principle constructing on the Technical College in Berlin In keeping with opposition events, this is only one instance of lots of false austerity insurance policies. “There are all the time closures at colleges, such because the Anna Lindh Faculty in Mitte, at sports activities services and swimming swimming pools,” criticized Left celebration chief Tobias Schulze.
“Bridges had been closed in a single day and needed to be demolished. There’s additionally an enormous renovation backlog in hospitals,” he advised the German Press Company. One other instance: The psychiatric ward within the Hedwigshöhe Hospital is about to be closed as a result of dilapidation.
Renovation backlog as a everlasting process
“We’re presently experiencing the results of too little funding within the upkeep of public infrastructure over the previous a long time,” mentioned the left-wing politician. “We now need to put money into upkeep or new alternative buildings.” The Left has proposed an funding company that may coordinate the varied duties – and an emergency fund for acute circumstances.
Inexperienced Celebration funds professional André Schulze can also be satisfied that the renovation backlog in Berlin is the results of a long time of lack of funding.
There’s nonetheless a major want for renovation, be it administrative buildings, universities, fireplace stations, bridges or youth golf equipment. Schulze sees this as an enduring problem: “Decreasing the renovation backlog may also be an essential process for the approaching authorities.” The following state parliament might be elected in Berlin on September twentieth.
© dpa-infocom, dpa:260512-930-67555/1